Collegamento ciclopedonale San Biagio di Callalta 2-3 stralcio - Bisiolengineering

Go to content
CYCLING/PEDESTRIAN LINK SAN BIAGIO DI CALLALTA FAGARE' - SECOND AND THIRD SHREDS, San Biagio di Callalta-TV
The fraction of Fagarè of battle (della battaglia) is connected to the centre of San Biagio di Callalta by the Regional Road (Postumia). It is a particularly narrow road but it has an elevated traffic's index. Therefore the municipal administration has decided to arrange the project of 3240 m (1630 m - 2° shred and 520 m - 3° shred) of the bike link specifically commited to permit a safety transit of pedestrians and cyclists.

Client                                                        
Municipality of san Biagio di Callalta                                 

Date
2011 - 2017

Amount
€ 565 500,00 (on the basis of an auction security charges included)
€ 780 000 (amount of works 2° shred)
€ 168750,00 (on the basis of an auction security charges included)
€ 220 000 (amount of works 3° shred)

Status of the work
Works in progress
Created by Emma Taverna, Martino Zaratin, Aurora Colla, Zeno Sirbu
BISIOL ENGINEERING
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net
STUDIO DI INGEGNERIA BISIOL BRUNO
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net

Back to content