Realizzazione di approdi fluviali lungo il Livenza, Caorle - VENEZIA - Copia - Bisiolengineering

Go to content
REALIZATION OF LANDING PLACES ALONG LIVENZA RIVER, Caorle - VENICE
The project involves the construction of two floating fluvial landing places with wooden finishes anchored on poles. It is also planned the construction of a slide of hauling and launching for small boats to create new fluvial tourist routes along Livenza river.

Client                                                       
Municipality of Caorle                          
                          
Date
1999 - 2000

Amount
€ 51 645, 69

Status of the work
Completed and tested works
Created by Emma Taverna, Martino Zaratin, Aurora Colla, Zeno Sirbu
BISIOL ENGINEERING
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net
STUDIO DI INGEGNERIA BISIOL BRUNO
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net

Back to content