Realizzazione nuovo essicatoio, silos e messa a norma di impianti, Comune di Musile di Piave - VE - Copia - Bisiolengineering

Go to content
REALIZATION OF A NEW DRYER, SILO AND  COMPLIANCE OF INSTALLATIONS, municipality of Musile di Piave - VE
Realization of a new dryer of 500 kg/h and two silos (h=15.10 mt, 2x270 ton.), a new building of load/discharge 1442 mc, toilet building at control room, fire extinguishing system (inclusive of tanks 70 mc., 3 feed pumps of 36 mc/h, 530 ml of buried pipes, 12 hydrants DN45, 4 hydrants UNI70, detection systems of sparks and fumes, 22 fire extinguishers).

Client                                                     
Soc. Agricola Cooperativa Basso Piave a R.L.                

Date
2012 - 2015

Amount
€ 1 000 000

Status of the work
Completed and tested works
Created by Emma Taverna, Martino Zaratin, Aurora Colla, Zeno Sirbu
BISIOL ENGINEERING
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net
STUDIO DI INGEGNERIA BISIOL BRUNO
Galleria Progresso 11/3
30027 San Donà di Piave (VE)
tel. +39 0421330926    +39 04211840073
fax. +39 04211840073    +39 1782246542
info@bisiolengineering.net
bruno.bisiol@ingpec.eu
www.bisiolengineering.net

Back to content